This site uses cookies which allow us to give you the best browsing experience possible. To find out more, please see our Privacy Policy.

Menu
Service & Products

Front End System HEMU 400, Korea

Front End System Including Nose Flaps HEMU 400, Korea:

Thrill of speed: Presently, the HEMU 400 undergoes thorough tests in South Korea. On the test track the highspeed train is supposed to reach more than 400 km/h. The intended series train, the next generation KTX, is planned to go into service in 2015, operating at a speed of more than 350 km/h.

A multiple stage energy absorption concept ensures highest safety: Damper and deformation tube in the coupler as well as additional frame-mounted deformation elements meet all the requirements of the EN 15227.

Our Contribution

  • Front nose module including front hatches
  • Front hatch kinematics
  • Elektronic coupler and front hatch control unit
  • Base frame with integrated crash system and obstacle deflector
  • AAR type automatic coupler with telescope and multiple stage energy absorbtion concept
  • Semi-permanent couplers with anti-climbing feature

Contact

Voith Turbo GmbH & Co KG

Gottfried-Linke-Straße 205 38239 Salzgitter, Germany

 

t +49 5341 21-02

Stakeholder Survey 2018 – Voith GmbH & Co KGaA


We cordially invite you to participate in our Stakeholder Survey 2018.

Its aim is to find out how you evaluate Voith's economic, social and environmental impacts and where you see improvement potentials in terms of the company’s sustainability performance.

The Survey Questionnaire will take around 10 minutes to complete.


Would you like to take part?

Yes
RIGHT OFFCANVAS AREA