Maintenance, Repair and Overhaul on Site
Service duration
Phase / Step | Duration in weeks (min./max.) |
---|---|
1. On-site survey or transport | 0,5 / 1,5 |
2. Disassembly, inspection with report, fault analysis | 0,5 / 1,0 |
3. Part repair (e.g. tooth regrinding) | 7,0 / 10,0 |
4. Gear unit assembly, test run | 0,5 / 1,0 |
5. Transport, gearbox or part assembly | 0,5 / 1,5 |